Getting a New Bathroom

12/03/2013 – 12/08/2013
We needed to reschedule the cabinet delivery that we initially scheduled before thanks giving due to the delay in tile delivery (it actually worked out because of such a bad imperfection of the concrete sub floor. We needed to spend a lot of unplanned time flattening the floor…), and not it costed us… the installation clue wasn’t available for the first week of December, and we needed to wait one week without doing much before we could finish everything else…

So we put our Christmas tree up.  Every year, my wife and I pickup an ornaments at places we go, and add to our tree.  It's a joy to see and think about the time and places we went together
So we put our Christmas tree up. Every year, my wife and I pickup an ornaments at places we go, and add to our tree. It’s a joy to see and think about the time and places we went together
I did Christmas lights just in time before our first snow...
I did Christmas lights just in time before our first snow…
I installed the double towel bar, and grab bar outside the tiles
I installed the double towel bar, and grab bar outside the tiles
The towel rack over the toilet.  wanted something like the one found in hotel bathroom.
The towel rack over the toilet. wanted something like the one found in hotel bathroom.
The towel rack over the toilet.  wanted something like the one found in hotel bathroom.
The towel rack over the toilet. wanted something like the one found in hotel bathroom.

12/09/2013

Vanity cabinet is installed by the cabinet guys.  exactly the color we like!
Vanity cabinet is installed by the cabinet guys. exactly the color we like!

The pantry has some imperfection in paint, so one door panel was sent back to be re-sprayed.  Also it was not attached to the wall yet because of un-plumbness of the wall.  They brought me a filler piece next day.
The pantry has some imperfection in paint, so one door panel was sent back to be re-sprayed. Also it was not attached to the wall yet because of un-plumbness of the wall. They brought me a filler piece next day.

12/10/2013

Measure, cut and fitted the filler piece and then screwed the cabinet to the wall.
Measure, cut and fitted the filler piece and then screwed the cabinet to the wall.

The granite is here!  we picked the stone at their shop.  though the color looks slightly different under our lights, we love the color and pattern of the piece!
The granite is here! we picked the stone at their shop. though the color looks slightly different under our lights, we love the color and pattern of the piece!
I decided to wait for Rick to be back next day to cut the crown molding (technically it's not a crown, but has some specific name for something small molding like this...)
I decided to wait for Rick to be back next day to cut the crown molding (technically it’s not a crown, but has some specific name for something small molding like this…)

12/11/2013

Those towel bar and shelf are also grab bars.  Screwed into the blocking that we installed before placed cement board and tiles, so they are as secure as it can be.
Those towel bar and shelf are also grab bars. Screwed into the blocking that we installed before placed cement board and tiles, so they are as secure as it can be.

Curved shower curtain rods and corner shelves are installed as well.
Curved shower curtain rods and corner shelves are installed as well.
The reason I waited to install those items on tile is that I was afraid of cracking the tile when I drill holes.  Rick told me how to, and i installed all of them while he was installing the plumbings for the vanity sink.
The reason I waited to install those items on tile is that I was afraid of cracking the tile when I drill holes. Rick told me how to, and i installed all of them while he was installing the plumbings for the vanity sink.
Rick installed the plumbings and faucets for the vanity.
Rick installed the plumbings and faucets for the vanity.
SWMBO had her term paper and stayed up all night (literary), so I stayed up with her, kept working on installing hardware.  When I finished installing vanity glass shelves, mirrors, and also caking the tub surround around 4:30 in the morning, I couldn't stayed up with her anymore and passed out on the couch...
SWMBO had her term paper and stayed up all night (literary), so I stayed up with her, kept working on installing hardware. When I finished installing vanity glass shelves, mirrors, and also caking the tub surround around 4:30 in the morning, I couldn’t stayed up with her anymore and passed out on the couch…

I also installed the rest of base board tiles, but forgot to take pictures….

12/12/2013
Ash, one of our chinchilla was not acting like usual, so we took her to vet, along with Mocha (the other chin) just for check up. We came back with Antibiotics, now facing a huge challenge of how we gonna feed it to Ash… anyhow, when we got home, I was pretty much ready to pass out from lack of sleep… so no work done…

12/13/2013 – 12/22/2013
Between SWMBO’s business trip and our chinchilla in vet, I was slacking off and didn’t do much till the 12/21 weekend… During the week, I painted the bedroom side wall, installed cabinet knobs, and a lot of cleanups. We also did touch up on other doors around the house since we got open paint anyways!

So, please continue to the tour of our new bathroom!

3 thoughts on “Getting a New Bathroom”

  1. Hi,
    just recently bought a craftsman air compressor, looks like yours. but without any labels.
    do you mind telling me what model is yours? i am trying to find a manual and some parts for it.

    thanks,

    John
    alllaji@gmail.com

    1. sorry being late, but will check the label tonight.

      Edit: I tried to find a model number and just couldn’t find it… sorry